| Route | County | Status | Location | Reason | Division | Last Modified |
| I-59 | Jefferson | Advisory | The second phase of a project to rebuild a portion of Interstate 59 from Alabama Adventure Parkway (Exit 110) to north of the CSX railroad overpass in Bessemer will be rescheduled.
Originally planned for Thursday, May 17 at 12:01 a.m., the upcoming southbound lane closure will be postponed until next week.
| ALDOT has set a target of 35 days for restoring southbound traffic on this portion of I-59. Interstate 459 will be used as a detour route. | 3 | 5/16/2012 3:19 PM |
| AL 75 | Marshall | Advisory | AL 75 at the Railroad Crossing in Albertville. | Railroad will be doing work with one lane closed at a time. Lane closure will alternate as needed. Work will be on Thursday, May 17 from 6:00 a.m. - 6:00 p.m. and Friday, May 18 from 6:00 a.m. until work is completed in the afternoon. | 1 | 5/16/2012 2:30 PM |
| I-59 | Jefferson | Advisory | Beginning at approximately 9:30 a.m., Wednesday, May 16th, weather conditions permitting, the Alabama Department of Transportation will close the I-59 northbound inside (left) lane for bridge maintenance, beginning just south of the bridge over 63rd Street (milepost 130.4) to just north of the same bridge.
| All travel lanes will be reopened to traffic no later than 3 p.m.
| 3 | 5/15/2012 7:00 PM |
| I-65 | Cullman | Advisory | I-65 from near MP 318 at the Morgan County line working southbound | Contractor will be cutting trees on the shoulder, southbound starting at the Morgan County line, beginning Friday, May 4. Shoulder will be closed at approximately 8:30 a.m. | 1 | 5/14/2012 9:22 AM |
| SR 216 | Tuscaloosa | Advisory | SR 216 between MP 23 and MP 24 at Ski Lake in the Lakeview Community | Safety barriers are in place along outside edgeline. Travel with reduced speeds and caution | 5 | 5/14/2012 8:20 AM |
| I-65 North bound | Escambia | Advisory | Escambia County, Atmore, I-65 North Bound from mile marker 47-49 outside lane closure. | Bridge Maintenance. | 9 | 5/14/2012 6:57 AM |
| I-65 | Jefferson | Advisory | Weather permitting, beginning Sunday, May 13, at 7 p.m. until Monday, May 14, at 6 a.m., ALDOT will be performing striping operations with moving lane closures on I-65 southbound and northbound from the US-31 Interchange (milepost 252.3) in Hoover to the Valleydale Road Interchange (milepost 247.0) in Shelby County. When work is completed in the southbound lanes it will be switched to the northbound lanes. The same procedure will be followed the following four nights. | Striping operations. | 3 | 5/11/2012 2:57 PM |
| US 78 | Jefferson | Advisory | Weather permitting, beginning Monday, May 14, at 7 p.m. until Tuesday, May 15, at 6 a.m., the Alabama Department of Transportation will at various times close the eastbound and westbound inside and outside lanes of US-78 (Bankhead Highway) from Finley Boulevard (milepost 135.116) to Cherry Avenue (milepost 136.646) to allow for paving operations to be done at this location. The same procedure will be followed the following four nights.
| Paving operations. | 3 | 5/11/2012 2:55 PM |
| US 31 | Jefferson | Advisory | Weather permitting, beginning Sunday, May 13, at 7 p.m. until Monday, May 14, at 6 a.m., the Alabama Department of Transportation announces at various times the northbound and southbound, inside and outside lanes of US-31 from the I-459/US-31 Interchange (milepost 264.28) to Columbiana Road (milepost 266.26) will be closed to allow for paving operations to be done at this location. The same procedure will be followed the following four nights. | Paving operations. | 3 | 5/11/2012 2:43 PM |
| US 31 (Elton B Stephens Expressway) | Jefferson | Advisory | SATURDAY, MAY 12 from 4 p.m. until 7 p.m.I-59 southbound inside (left) lane and approach area at the 22nd Street inside exit ramp (exit 125-B) will be closed from just south of the 31st Street entrance ramp to just south of the 22nd Street exit ramp. The 22nd Street ramp will remain open; however it will be narrowed to allow adequate space for equipment and personnel to complete the work safely. | Impact Attenuator repairs. | 3 | 5/10/2012 5:43 PM |
| US 31 (Elton B Stephens Expressway) | Jefferson | Advisory | SATURDAY, MAY 12 from 1 p.m. until 4 p.m.I-59 northbound outside (right) lane and approach area at the 22nd Street exit ramp (exit 125-B) will be closed from just north of the 17th Street exit ramp to just north of the 22nd Street exit ramp. The 22nd Street ramp (exit 125-B) will remain open; however it will be narrowed to allow adequate space for equipment and personnel to complete the work safely. | Impact Attenuator repairs. | 3 | 5/10/2012 5:41 PM |
| US 31 (Elton B Stephens Expresway) | Jefferson | Advisory | SATURDAY, MAY 12 from 10 a.m. until 1 p.m.US 31 (Elton B. Stephens Expressway) northbound entrance ramp leading to the I-59 southbound will be narrowed and the inside (left) lane of the I-59 northbound entrance ramp will be closed. Both ramps to I-59 northbound and southbound will remain open; however, they will be narrowed to allow adequate space for equipment and personnel to complete the work safely. | Impact Attenuator repairs. | 3 | 5/10/2012 5:38 PM |
| US 31 (Elton B. Stephens Expwy) | Jefferson | Advisory | SATURDAY, MAY 12 from 7 a.m. until 10 a.m. US 31 (Elton B. Stephens Expressway) northbound inside ( left) lane at the I-59 ramps and the outside (right) lane of US 31 (Elton B. Stephens Expressway) northbound (26th Street/Carraway Blvd) ramp will be closed from just south of the I-59 NB/SB ramp to just north of the ramp. Both the I-59 NB/SB ramp and the ramp to 26th Street will remain open; however, they will be narrowed to allow adequate space for equipment and personnel to complete the work. | Impact Attenuator repairs. | 3 | 5/10/2012 5:36 PM |
| I-459 | Jefferson | Advisory | Beginning at approximately 10 p.m., Saturday evening, May 12, weather conditions permitting, ALDOT will make concrete pavement repairs on the I-459 northbound inside (left) two (2) lanes, at the I-65 Interchange (exit 15), beginning at the I-65 exit ramp (milepost 14.3) to the I-65 entrance ramp (milepost 16.0).
| All travel lanes will be reopened to traffic no later than 5 a.m., Monday, May 14.
The lanes will be closed in the area of repairs for the time needed to remove and replace the damaged concrete and to allow a minimum of 14 hours of curing time after the repairs are made.
| 3 | 5/10/2012 3:23 PM |
| I-65 | Jefferson | Advisory | Weather permitting Fri., May 11th & Tues. May 15th at 1:30 p.m., blasting operations will continue on I-65 between Daniel Payne Drive (Exit 264) and Walkers Chapel Road (Exit 267). A rolling roadblock by Alabama State Troopers and the City of Fultondale police will slow I-65 traffic northbound between the I-20/59 & I-65 Interchange (Exit 261) and Walkers Chapel Road (Exit 267). | Blasting operation. The operation will also be affecting US-31 southbound and northbound traffic from Ellard Road to the US-31 southbound on ramp to I-65 until blasting is complete. This will take approximately 10 minutes to complete
| 3 | 5/9/2012 5:22 PM |
| I-85 | Lee | Advisory | Northbound Right Lane @ M.P. 56.7 | Roadway repair in this area. Please use caution. | 4 | 5/8/2012 9:04 AM |
| State Route 150 | Jefferson | Advisory | Beginning Tuesday, May 8, at 9 a.m. until 3:30 p.m., ALDOT will begin repairs of the bridge on State Route 150 over Patton Creek (at Paradise Lake) between US-31 and I-459, in Hoover. | Repairs on the westbound outside (right) lane of the bridge. | 3 | 5/8/2012 8:24 AM |
| I-59 | Jefferson | Advisory | I-59 NB & I-59 SB MP 111 - MP 115 | Sunday, May 6 @ 9PM until Monday, May 7 @ 6AM paving (outside) lane and ramps from the 19th & 18th Street in Bessemer.
Monday, May 7 @ 9PM until Tuesday, May 8 @ 6AM. paving NB & SB from Allison/Bonnet Interchange to 19th & 18th Street. The same procedure will be followed the next three nights | 3 | 5/7/2012 3:21 PM |
| SR 59 | Baldwin | Advisory | SR 59 Southbound Milepost 29 thru 28 Right lane closure from 12:30pm until 2:00pm. | Maintenance crew will be patching potholes. | 9 | 5/7/2012 8:55 AM |
| SR 59 | Baldwin | Advisory | SR 59 Northbound Milepost 28 thru 29 Left lane closure from 10:00am until 12:00pm. | Maintenance crew will be patching potholes. | 9 | 5/7/2012 8:49 AM |
|