Home  ::  Travel  ::  Business   ::  Organization  ::   Information  ::  Careers   ::  Links  ::  Contact Us  ::  Sitemap
banner
Home >> Bureaus >> Maintenance >> Emergency Road Closures

Alabama Department of Transportation

Emergency Road Closures



    Select A County     Or Enter A Division (1-9)                         
RouteCountyStatusLocationReasonDivisionLast Modified
US31EscambiaClosedUS31 at milepost 35.8 near the Baldwin/Escambia County line, a detour route is signed around the closure. The detour includes Baldwin County Road 47, I-65, and Jack Springs Road.The roadway is closed for emergency drainage repairs that will take five to six weeks to complete.92/8/2010 8:05 PM
I-59/20 NTuscaloosaAdvisoryI-59 Northbound, Left lane next to Barrier Wall, between MP 85-97 in Tuscaloosa County.Divisionwide crew repairing concrete median barrier wall beginning Wednesday, February 10 through Thursday, February 11, 2010. The work will begin at 8:30 a.m. and end at approximately 3:30 p.m. each day. Motorists should be alert to signs, message boards, and personnel on the ground and use extreme caution while traveling this section of highway. Motorists should expect delays up to 15 minutes.52/8/2010 4:49 PM
I-59JeffersonAdvisoryOn Tuesday morning, February 9, weather conditions permitting, between 9:30 a.m. and 3:00 p.m., ALDOT will make repairs to the bridge railing, located on the I-59 northbound bridge, inside (left) lane over, 3rd Avenue North, near I-20 Interchange (Exit 130), in Birmingham. This work will require the inside (left) travel lane and shoulder to be closed in the area of the repairs. Bridge rail repairs-This repair will require an intermittent lane closure in the area of the repair for 4 to 5 days dependent on weather conditions and work progress. The travel lane and shoulder will be reopened to traffic by 3:00 p.m. each day. 32/8/2010 3:14 PM
SR 6 (U.S. 82) EBBibbOpenSR 6 (U.S. 82) Eastbond lanes at intersection of SR 219 and SR 25 in Centreville.Monday, 2/8/10, eastbound lanes now open to traffic. 18-wheeler crash cleared. 52/8/2010 2:50 PM
US 231 South (SR 53)MontgomeryAdvisoryHWY US 231 South in Montgomery County between MP 91.955 and MP 93.745, NorthboundReason: On Wednesday, February 10th, 2010 Third District Maintenance Crews will be conducting a moving lane closure in the northbound, right lane between 3:00 PM and 4:00 PM .Sixth Division Testing and Materials crews will be core drilling for road samples in that area. Please use caution when travelling through the work area. 62/8/2010 11:03 AM
US 331 South (SR-9)MontgomeryAdvisoryHWY 331 South in Montgomery County between MP 84.513 and MP 111.883, Northbound On Wednesday, February 10th, 2010 Third District Maintenance Crews will be conducting a lane closure in the northbound, right lane between 1:30 PM and 3:00 PM .Sixth Division Testing and Materials crews will be core drilling for road samples in that area. Please use caution when travelling through the work area. 62/8/2010 10:59 AM
HWY 80 West (SR 8)MontgomeryAdvisoryHWY 80 West in Montgomery County between MP 121.591 and MP 126.581, Eastbound On Wednesday, February 10th, 2010 Third District Maintenance Crews will be conducting a moving lane closure in the eastbound right lane between 12:00 Noon and 1:30 PM .Sixth Division Testing and Materials crews will be core drilling for road samples in that area. Please use caution when travelling through the work area. 62/8/2010 10:53 AM
US 31 North (SR 3)MontgomeryAdvisory US 31 North in Montgomery County between MP 179.999 and MP 186.018, northbound On Wednesday, February 10, 2010, Third District Maintenence Crews will be conducting a moving lane closure in the northbound, right lane between 9:00 AM and 11:00 AM. Sixth Division Testing and Materials crews will be core drilling for road samples in that area. Please use caution when travelling through the work zone 62/8/2010 10:46 AM
I-85 (SR 685)MontgomeryAdvisoryI-85 in Montgomery County between MP 4.750 and MP 5.040, northbound On Wednesday, February 10th, 2010 Third District Maintenance Crews will be conducting a lane closure in the northbound right lane between 11:00 AM and 12:00 Noon. Sixth Division Testing and Materials crews will be core drilling for road samples in that area. Please use caution when travelling through the work area. 62/8/2010 10:39 AM
I-85 SBLee AdvisoryMP 54.5 South Bound Right LaneEmergency Guard Rail Repair42/8/2010 8:18 AM
123



There have been 440 hit(s) to this page today!
The Road Closures Page has been visited 678,001 times since June 1, 2009.
The last visit to this page was 2/9/2010 6:17:02 PM



Alabama Department of Transportation | 1409 Coliseum Blvd. | Montgomery, Alabama 36110 | Phone: 334-242-6358
Please send questions or comments about this site to webmaster@dot.state.al.us
Legal Disclaimer